How it works

The system is built on one idea: every number has a single source. A number written in two places diverges between them, and the divergence is only ever discovered in a dispute.

1 · The bill of quantities is the origin

BOQ items are entered with their quantities and rates. Everything after is measured against them: the purchase order, the issue from store, the payment certificate, the daily report. The item is the link between plan and actual.

2 · Procurement comes before spend

Purchase request → quotations compared (cheapest and fastest flagged automatically) → purchase order approved → goods received. An approved commitment becomes actual cost on receipt, not before. And an order with fewer than the required number of quotations needs a written exception reason.

3 · The certificate is calculated, not typed

Certified quantities are checked cumulatively against the BOQ plan, and anything beyond it is rejected. Then the contract rates apply in order: the advance is recovered, retention is deducted, tax is computed on the correct base — and the rates are frozen into the certificate when it is created, so changing them later does not rewrite the past.

4 · Cash against commitment

The finance board compares what was certified against what was actually collected and paid: left to collect, left to pay, net cash, and net cash after the advance. Every payment is linked to its certificate and deducted from what it owes.

5 · The waste detector reads and never writes

Twelve deterministic rules run over your data on demand and change not a single row. Every finding carries its evidence: which item, which two numbers disagreed, and by how much. A reviewer can say “this is right” or “this is understood” — which is what a deterministic rule is for.

6 · Who sees what

RoleSeesDoes not see
Company ownerAll of their company's data, project profitability, and permissions
Engineer / staffAssigned projects, purchase requests, reports, and qualityMoney figures, team management, and unassigned projects
Site foremanToday's tasks, labour attendance, material receipt and issue, and site photosMoney figures and certificate creation
Platform adminCompanies, subscriptions, and headline metricsCustomers' project data

And the boundary is in the server, not the screen: a request arriving from outside the UI gets a 403, and that is tested role by role and route by route.

7 · On site, with no signal

The daily report and its photos are stored on the device while the connection is down and sent when it returns. A foreman is not asked to find a cell tower to record their day.

8 · Your data is yours

Every report exports to CSV and Excel, and purchase orders and certificates print in a form that can be sent to an external party. The audit log says who changed what, and when.